Operating Procedures for Screw Air Compressor

2026-04-10Views:

What are the operating procedures and precautions of the screw air compressor system? Here to introduce to you.

1. screw air compressor start

1. Turn off the power and check whether the power indicator is on.

2. Press the start button, the main controller automatically controls the loading and unloading of the air compressor.

3. Check the oil level when loading, the oil level must be between the upper and lower lines.

4. When the machine is running, the temperature displayed on the panel will increase accordingly. When it reaches 85 degrees, the fan will automatically start, and when the temperature drops to 75 degrees, the fan will stop.

Shutdown of 2. screw air compressor

1. If air is not used for a long time and air leaks, the air compressor will automatically stop after 30 minutes of no-load operation. At this time, the no-load shutdown time is too long. When it is lower than the loading pressure, the machine will automatically load and run.

2. Press the red stop button to stop manually, the loading indicator light goes out, and the air compressor must be started manually after unloading for 10-30 seconds.

3. considerations

1. Always check whether there is oil leakage inside the air compressor. If there is a large area of oil leakage, stop the machine immediately.

2. Use compressed air to remove the dust in the air filter and the cooler above the air compressor every week to ensure that less dust enters the compressor head and the heat dissipation effect is good.

3. Remove the moisture in the gas tank every week to avoid excessive moisture entering the gas pipeline.

4. After the new machine runs for 500 hours, the oil filter, lubricating oil, and air filter need to be replaced every 2500-3000 hours.